All industries › Utility solar › Wisconsin › Apple River Solar

Utility solar illustration Utility solar · Polk County, Wisconsin

Apple River Solar

A 100 MW utility solar project in Polk County, Wisconsin. Apple River Solar is built and in service. Public records name Geronimo Power as its developer. No public record read so far names its builder.

The record

What the public record says about Apple River Solar, as of 22 Oct 2026.

StageOperating
Construction startIn service since 2025
Size100 MW
LocationPolk County, Wisconsin (to about 10 km)
DeveloperGeronimo Power
Grid operator—
Builder (EPC)Not named yet
Trade subcontractors in the app
People to call in the app
Phase windows in the app

Every fact in the app links to the public record behind it, with how many records agree and whether it is confirmed, reported or an estimate. What the terms mean.

What happened

Each change dated by the scene or the document, newest first.

  1. Entered the public record for the first time.

Who was named on it, and when, is in the app.

Also developed by Geronimo Power

ProjectStageSize
Portage SolarUtility solar · Portage County, WisconsinUnder construction250 MW
Bee Hollow SolarUtility solar · St Clair County, IllinoisUnder construction150 MW
Jackson County SolarUtility solar · Jackson County, MichiganUnder construction125 MW
Grant SolarUtility solar · McCook County, South DakotaPre-construction99 MW
Yellowbud SolarUtility solar · Ross County, OhioOperating274 MW
Prairie Wolf SolarUtility solar · Coles County, IllinoisOperating200 MW

Every Geronimo Power project

Also in Polk County

ProjectStageSize
Unnamed 100 MW solar projectUtility solarUnder construction100 MW
Georgetown (Polk Burnett)Utility solarOperating2 MW
LuckUtility solarOperating2 MW
Sand Lake DPC SolarUtility solarOperating1 MW

More

Questions

Apple River Solar, in short.

Where is Apple River Solar?

Apple River Solar is a 100 MW utility solar project in Polk County, Wisconsin. The public page places it to within about ten kilometres; the precise location is in the subscriber record.

When does construction start on Apple River Solar?

Apple River Solar is built and in service since 2025.

Who is developing Apple River Solar?

Geronimo Power, as the public record names it.

Who is building Apple River Solar?

No public record read so far names a builder for Apple River Solar. Groundtrace leaves the field empty rather than guess, and fills it when a permit, a filing or the builder's own page names one.

Pricing

Free to explore. Subscribe for the full record.

Usage-based, no seats, cancel any time. Pay for what your team and your assistant actually use.

Explore

Free

  • The map, by state and industry
  • The next projects to break ground, per state
  • A page per project, developer and grid operator
  • The glossary and guides
Browse coverage

Team

From $750 per month2,000 records included, then $0.25 per record. Month to month.

  • Every project in development, with timelines
  • Builders, developers and trade subcontractors
  • Work contacts
  • App, API and MCP server
Request access

Enterprise

Custom

  • Everything in Team
  • Watchlists and alerts
  • New states and industries on request
  • Dedicated support
Request access

Request access

Tell us what you sell. We answer within a working day.

Write to hello@groundtrace.io with your name, your company and what you sell, and we set up your access.