All industries › Utility solar › Massachusetts › Fall River Solar CSG
Utility solar · Bristol County, Massachusetts
Fall River Solar CSG
A 2 MW utility solar project in Bristol County, Massachusetts. Fall River Solar CSG is built and in service. Public records name MN8 Energy LLC as its developer. No public record read so far names its builder.
The record
What the public record says about Fall River Solar CSG, as of 25 Oct 2026.
| Stage | Operating |
|---|---|
| Construction start | In service since 2013 |
| Size | 2 MW |
| Location | Bristol County, Massachusetts (to about 10 km) |
| Developer | MN8 Energy LLC |
| Grid operator | — |
| Builder (EPC) | Not named yet |
| Trade subcontractors | in the app |
| People to call | in the app |
| Phase windows | in the app |
Every fact in the app links to the public record behind it, with how many records agree and whether it is confirmed, reported or an estimate. What the terms mean.
What happened
Each change dated by the scene or the document, newest first.
No change on record since Groundtrace started tracking it.
Who was named on it, and when, is in the app.
Also developed by MN8 Energy LLC
| Project | Stage | Size |
|---|---|---|
| Walker SolarUtility solar · Juniata County, Pennsylvania | Under construction | 80 MW |
| MammothUtility solar · Kanawha County, West Virginia | Queued | 86 MW |
| SLATEUtility solar · Kings County, California | Operating | 308 MW |
| Mount Signal Solar Farm IIUtility solar · Imperial County, California | Operating | 154 MW |
| American Beech SolarUtility solar · Halifax County, North Carolina | Operating | 140 MW |
| Prairie SolarUtility solar · Champaign County, Illinois | Operating | 135 MW |
Also in Bristol County
| Project | Stage | Size |
|---|---|---|
| Borrego - Highland AveUtility solar | Under construction | 5 MW |
| Clems Way SolarUtility solar | Pre-construction | 5 MW |
| Battery StorageBattery storage | Queued | 170 MW |
| Salt Cod BESSBattery storage | Queued | 168 MW |
| NL MA - CopicutUtility solar | Operating | 8 MW |
| DartmouthUtility solar | Operating | 6 MW |
More
Questions
Fall River Solar CSG, in short.
Where is Fall River Solar CSG?
Fall River Solar CSG is a 2 MW utility solar project in Bristol County, Massachusetts. The public page places it to within about ten kilometres; the precise location is in the subscriber record.
When does construction start on Fall River Solar CSG?
Fall River Solar CSG is built and in service since 2013.
Who is developing Fall River Solar CSG?
MN8 Energy LLC, as the public record names it.
Who is building Fall River Solar CSG?
No public record read so far names a builder for Fall River Solar CSG. Groundtrace leaves the field empty rather than guess, and fills it when a permit, a filing or the builder's own page names one.
Pricing
Free to explore. Subscribe for the full record.
Usage-based, no seats, cancel any time. Pay for what your team and your assistant actually use.
Explore
Free
- The map, by state and industry
- The next projects to break ground, per state
- A page per project, developer and grid operator
- The glossary and guides
Team
From $1,500 per month2,000 records included, then $0.25 per record. Month to month.
- Every project in development, with timelines
- Builders, developers and trade subcontractors
- Work contacts
- App, API and MCP server
Enterprise
Custom
- Everything in Team
- Watchlists and alerts
- New states and industries on request
- Dedicated support
Request access
Tell us what you sell. We answer within a working day.
Write to hello@groundtrace.io with your name, your company and what you sell, and we set up your access.