All industries › Utility solar › North Carolina › Gaston Solar Power Plant
Utility solar · Gaston County, North Carolina
Gaston Solar Power Plant
A 25 MW utility solar project in Gaston County, North Carolina. Gaston Solar Power Plant is built and in service. Public records name Duke Energy Carolinas, LLC as its developer. No public record read so far names its builder.
The record
What the public record says about Gaston Solar Power Plant, as of 23 Oct 2026.
| Stage | Operating |
|---|---|
| Construction start | In service since 2020 |
| Size | 25 MW |
| Location | Gaston County, North Carolina (to about 10 km) |
| Developer | Duke Energy Carolinas, LLC |
| Grid operator | — |
| Builder (EPC) | Not named yet |
| Trade subcontractors | in the app |
| People to call | in the app |
| Phase windows | in the app |
Every fact in the app links to the public record behind it, with how many records agree and whether it is confirmed, reported or an estimate. What the terms mean.
What happened
Each change dated by the scene or the document, newest first.
No change on record since Groundtrace started tracking it.
Who was named on it, and when, is in the app.
Also developed by Duke Energy Carolinas, LLC
| Project | Stage | Size |
|---|---|---|
| Allen 2 BESSBattery storage · Gaston County, North Carolina | Under construction | 167 MW |
| Maiden Creek BatteryBattery storage · Catawba County, North Carolina | Under construction | 50 MW |
| Baxter Creek SolarUtility solar · Davie County, North Carolina | Under construction | 30 MW |
| Baxter Creek SolarUtility solar · Davie County, North Carolina | Under construction | 30 MW |
| Craggy Energy StorageBattery storage · Buncombe County, North Carolina | Under construction | 30 MW |
| Robinson Solar PlantUtility solar · Chesterfield County, South Carolina | Pre-construction | 76 MW |
Also in Gaston County
| Project | Stage | Size |
|---|---|---|
| Allen 2 BESSBattery storage | Under construction | 167 MW |
| Hornet SolarUtility solar | Under construction | 73 MW |
| Allen 1 Battery Energy Storage SystemBattery storage | Operating | 50 MW |
| High Shoals PV1Utility solar | Operating | 16 MW |
| Auten Road FarmUtility solar | Operating | 5 MW |
| Mariposa Solar CenterUtility solar | Operating | 5 MW |
More
Questions
Gaston Solar Power Plant, in short.
Where is Gaston Solar Power Plant?
Gaston Solar Power Plant is a 25 MW utility solar project in Gaston County, North Carolina. The public page places it to within about ten kilometres; the precise location is in the subscriber record.
When does construction start on Gaston Solar Power Plant?
Gaston Solar Power Plant is built and in service since 2020.
Who is developing Gaston Solar Power Plant?
Duke Energy Carolinas, LLC, as the public record names it.
Who is building Gaston Solar Power Plant?
No public record read so far names a builder for Gaston Solar Power Plant. Groundtrace leaves the field empty rather than guess, and fills it when a permit, a filing or the builder's own page names one.
Pricing
Free to explore. Subscribe for the full record.
Usage-based, no seats, cancel any time. Pay for what your team and your assistant actually use.
Explore
Free
- The map, by state and industry
- The next projects to break ground, per state
- A page per project, developer and grid operator
- The glossary and guides
Team
From $750 per month2,000 records included, then $0.25 per record. Month to month.
- Every project in development, with timelines
- Builders, developers and trade subcontractors
- Work contacts
- App, API and MCP server
Enterprise
Custom
- Everything in Team
- Watchlists and alerts
- New states and industries on request
- Dedicated support
Request access
Tell us what you sell. We answer within a working day.
Write to hello@groundtrace.io with your name, your company and what you sell, and we set up your access.