All industries › Utility solar › Kentucky › Green River Solar
Utility solar · Meade County, Kentucky
Green River Solar
A 200 MW utility solar project in Meade County, Kentucky. Green River Solar is built and in service. Public records name Merino Solar LLC as its developer. No public record read so far names its builder.
The record
What the public record says about Green River Solar, as of 1 Nov 2026.
| Stage | Operating |
|---|---|
| Construction start | In service since 2025 |
| Size | 200 MW |
| Location | Meade County, Kentucky (to about 10 km) |
| Developer | Merino Solar LLC |
| Grid operator | MISO |
| Builder (EPC) | Not named yet |
| Trade subcontractors | in the app |
| People to call | in the app |
| Phase windows | in the app |
Every fact in the app links to the public record behind it, with how many records agree and whether it is confirmed, reported or an estimate. What the terms mean.
What happened
Each change dated by the scene or the document, newest first.
- Moved from under construction to operating.
- Moved from operating to under construction.
- A filing dates the construction start to December 2023.
- Stormwater permit filed.
Who was named on it, and when, is in the app.
More
Questions
Green River Solar, in short.
Where is Green River Solar?
Green River Solar is a 200 MW utility solar project in Meade County, Kentucky, in MISO's interconnection queue. The public page places it to within about ten kilometres; the precise location is in the subscriber record.
When does construction start on Green River Solar?
Green River Solar is built and in service since 2025.
Who is developing Green River Solar?
Merino Solar LLC, as the public record names it.
Who is building Green River Solar?
No public record read so far names a builder for Green River Solar. Groundtrace leaves the field empty rather than guess, and fills it when a permit, a filing or the builder's own page names one.
Pricing
Free to explore. Subscribe for the full record.
Usage-based, no seats, cancel any time. Pay for what your team and your assistant actually use.
Explore
Free
- The map, by state and industry
- The next projects to break ground, per state
- A page per project, developer and grid operator
- The glossary and guides
Team
From $1,500 per month2,000 records included, then $0.25 per record. Month to month.
- Every project in development, with timelines
- Builders, developers and trade subcontractors
- Work contacts
- App, API and MCP server
Enterprise
Custom
- Everything in Team
- Watchlists and alerts
- New states and industries on request
- Dedicated support
Request access
Tell us what you sell. We answer within a working day.
Write to hello@groundtrace.io with your name, your company and what you sell, and we set up your access.