All industries › Utility solar › California › Sealed Air Madera Solar Project
Utility solar · Madera County, California
Sealed Air Madera Solar Project
A 3 MW utility solar project in Madera County, California. Sealed Air Madera Solar Project is built and in service. Public records name Sealed Air Corporation as its developer. No public record read so far names its builder.
The record
What the public record says about Sealed Air Madera Solar Project, as of 25 Oct 2026.
| Stage | Operating |
|---|---|
| Construction start | In service since 2022 |
| Size | 3 MW |
| Location | Madera County, California (to about 10 km) |
| Developer | Sealed Air Corporation |
| Grid operator | — |
| Builder (EPC) | Not named yet |
| Trade subcontractors | in the app |
| People to call | in the app |
| Phase windows | in the app |
Every fact in the app links to the public record behind it, with how many records agree and whether it is confirmed, reported or an estimate. What the terms mean.
What happened
Each change dated by the scene or the document, newest first.
- Entered the public record for the first time.
Who was named on it, and when, is in the app.
Also in Madera County
| Project | Stage | Size |
|---|---|---|
| LOTUS SOLAR 2Utility solar | Under construction | 203 MW |
| Borden Solar FarmUtility solar | Operating | 50 MW |
| LOTUS SOLAR FARMUtility solar | Operating | 50 MW |
| Adera SolarUtility solar | Operating | 20 MW |
| CHOWCHILLA SOLAR PROJECTUtility solar | Operating | 20 MW |
| KDC Solar MaderaUtility solar | Operating | 10 MW |
More
Questions
Sealed Air Madera Solar Project, in short.
Where is Sealed Air Madera Solar Project?
Sealed Air Madera Solar Project is a 3 MW utility solar project in Madera County, California. The public page places it to within about ten kilometres; the precise location is in the subscriber record.
When does construction start on Sealed Air Madera Solar Project?
Sealed Air Madera Solar Project is built and in service since 2022.
Who is developing Sealed Air Madera Solar Project?
Sealed Air Corporation, as the public record names it.
Who is building Sealed Air Madera Solar Project?
No public record read so far names a builder for Sealed Air Madera Solar Project. Groundtrace leaves the field empty rather than guess, and fills it when a permit, a filing or the builder's own page names one.
Pricing
Free to explore. Subscribe for the full record.
Usage-based, no seats, cancel any time. Pay for what your team and your assistant actually use.
Explore
Free
- The map, by state and industry
- The next projects to break ground, per state
- A page per project, developer and grid operator
- The glossary and guides
Team
From $1,500 per month2,000 records included, then $0.25 per record. Month to month.
- Every project in development, with timelines
- Builders, developers and trade subcontractors
- Work contacts
- App, API and MCP server
Enterprise
Custom
- Everything in Team
- Watchlists and alerts
- New states and industries on request
- Dedicated support
Request access
Tell us what you sell. We answer within a working day.
Write to hello@groundtrace.io with your name, your company and what you sell, and we set up your access.