All industries › Utility solar › Texas › Swift Air Solar I
Utility solar · Ector County, Texas
Swift Air Solar I
A 145 MW utility solar project in Ector County, Texas. Swift Air Solar I is built and in service. Public records name Origis Energy USA, Inc as its developer. A builder is on record; its name and the people to call are in the app.
The record
What the public record says about Swift Air Solar I, as of 26 Oct 2026.
| Stage | Operating |
|---|---|
| Construction start | In service since 2025 |
| Size | 145 MW |
| Location | Ector County, Texas (to about 10 km) |
| Developer | Origis Energy USA, Inc |
| Grid operator | — |
| Builder (EPC) | on record, in the app |
| Trade subcontractors | in the app |
| People to call | in the app |
| Phase windows | in the app |
Every fact in the app links to the public record behind it, with how many records agree and whether it is confirmed, reported or an estimate. What the terms mean.
What happened
Each change dated by the scene or the document, newest first.
- Entered the public record for the first time.
- A filing dates the construction start to January 2024.
- Stormwater permit filed.
Who was named on it, and when, is in the app.
Also developed by Origis Energy USA, Inc
| Project | Stage | Size |
|---|---|---|
| Sand Luis WestUtility solar · Fresno County, California | Under construction | 125 MW |
| Covington (MS)Utility solar · Covington County, Mississippi | Under construction | 96 MW |
| CHALAN SOLARUtility solar · Kern County, California | Under construction | 65 MW |
| Rockhound AUtility solar · Ector County, Texas | Operating | 245 MW |
| Escalante (NM)Utility solar · McKinley County, New Mexico | Operating | 200 MW |
| Golden TriangleUtility solar · Lowndes County, Mississippi | Operating | 200 MW |
Also in Ector County
| Project | Stage | Size |
|---|---|---|
| Greyhound SolarUtility solar | Under construction | 335 MW |
| Cipher Mining Odessa Data CenterData centers | Under construction | 52 acres |
| Van Zandt Energy StorageBattery storage | Financed | 256 MW |
| Sisters SolarUtility solar | Financed | 101 MW |
| Gypsum Plains SolarUtility solar | Queued | 503 MW |
| Jackrabbit Flats SolarUtility solar | Queued | 401 MW |
More
Questions
Swift Air Solar I, in short.
Where is Swift Air Solar I?
Swift Air Solar I is a 145 MW utility solar project in Ector County, Texas. The public page places it to within about ten kilometres; the precise location is in the subscriber record.
When does construction start on Swift Air Solar I?
Swift Air Solar I is built and in service since 2025.
Who is developing Swift Air Solar I?
Origis Energy USA, Inc, as the public record names it.
Who is building Swift Air Solar I?
A builder is named for Swift Air Solar I in the public record. Its name, the trade subcontractors and the people to call are in the subscriber record, each with the record that names it.
Pricing
Free to explore. Subscribe for the full record.
Usage-based, no seats, cancel any time. Pay for what your team and your assistant actually use.
Explore
Free
- The map, by state and industry
- The next projects to break ground, per state
- A page per project, developer and grid operator
- The glossary and guides
Team
From $1,500 per month2,000 records included, then $0.25 per record. Month to month.
- Every project in development, with timelines
- Builders, developers and trade subcontractors
- Work contacts
- App, API and MCP server
Enterprise
Custom
- Everything in Team
- Watchlists and alerts
- New states and industries on request
- Dedicated support
Request access
Tell us what you sell. We answer within a working day.
Write to hello@groundtrace.io with your name, your company and what you sell, and we set up your access.