All industries › Utility solar › Texas › Swift Air Solar II

Utility solar illustration Utility solar · Ector County, Texas

Swift Air Solar II

A 174 MW utility solar project in Ector County, Texas. Swift Air Solar II is built and in service. Public records name ORIGIS ENERGY USA, INC. as its developer. No public record read so far names its builder.

The record

What the public record says about Swift Air Solar II, as of 25 Oct 2026.

StageOperating
Construction startIn service since 2025
Size174 MW
LocationEctor County, Texas (to about 10 km)
DeveloperORIGIS ENERGY USA, INC.
Grid operator—
Builder (EPC)Not named yet
Trade subcontractors in the app
People to call in the app
Phase windows in the app

Every fact in the app links to the public record behind it, with how many records agree and whether it is confirmed, reported or an estimate. What the terms mean.

What happened

Each change dated by the scene or the document, newest first.

No change on record since Groundtrace started tracking it.

Who was named on it, and when, is in the app.

Also developed by ORIGIS ENERGY USA, INC.

ProjectStageSize
Sand Luis WestUtility solar · Fresno County, CaliforniaUnder construction125 MW
Covington (MS)Utility solar · Covington County, MississippiUnder construction96 MW
CHALAN SOLARUtility solar · Kern County, CaliforniaUnder construction65 MW
Rockhound AUtility solar · Ector County, TexasOperating245 MW
Escalante (NM)Utility solar · McKinley County, New MexicoOperating200 MW
Golden TriangleUtility solar · Lowndes County, MississippiOperating200 MW

Every ORIGIS ENERGY USA, INC. project

Also in Ector County

ProjectStageSize
Greyhound SolarUtility solarUnder construction335 MW
Cipher Mining Odessa Data CenterData centersUnder construction52 acres
Van Zandt Energy StorageBattery storageFinanced256 MW
Sisters SolarUtility solarFinanced101 MW
Gypsum Plains SolarUtility solarQueued503 MW
Jackrabbit Flats SolarUtility solarQueued401 MW

Every project in Ector County

More

Questions

Swift Air Solar II, in short.

Where is Swift Air Solar II?

Swift Air Solar II is a 174 MW utility solar project in Ector County, Texas. The public page places it to within about ten kilometres; the precise location is in the subscriber record.

When does construction start on Swift Air Solar II?

Swift Air Solar II is built and in service since 2025.

Who is developing Swift Air Solar II?

ORIGIS ENERGY USA, INC., as the public record names it.

Who is building Swift Air Solar II?

No public record read so far names a builder for Swift Air Solar II. Groundtrace leaves the field empty rather than guess, and fills it when a permit, a filing or the builder's own page names one.

Pricing

Free to explore. Subscribe for the full record.

Usage-based, no seats, cancel any time. Pay for what your team and your assistant actually use.

Explore

Free

  • The map, by state and industry
  • The next projects to break ground, per state
  • A page per project, developer and grid operator
  • The glossary and guides
Browse coverage

Team

From $1,500 per month2,000 records included, then $0.25 per record. Month to month.

  • Every project in development, with timelines
  • Builders, developers and trade subcontractors
  • Work contacts
  • App, API and MCP server
Request access

Enterprise

Custom

  • Everything in Team
  • Watchlists and alerts
  • New states and industries on request
  • Dedicated support
Request access

Request access

Tell us what you sell. We answer within a working day.

Write to hello@groundtrace.io with your name, your company and what you sell, and we set up your access.