All industries › Utility solar › New Mexico › Blackwater Solar Center - NM
Utility solar · Roosevelt County, New Mexico
Blackwater Solar Center - NM
A 199 MW utility solar project in Roosevelt County, New Mexico. Blackwater Solar Center - NM has work under way on site. A builder is on record; its name and the people to call are in the app.
The record
What the public record says about Blackwater Solar Center - NM, as of 20 Nov 2026.
| Stage | Under construction |
|---|---|
| Construction start | Q2 2026 permit issued |
| Size | 199 MW |
| Location | Roosevelt County, New Mexico (to about 10 km) |
| Developer | Not named in any record read |
| Grid operator | — |
| Builder (EPC) | on record, in the app |
| Trade subcontractors | in the app |
| People to call | in the app |
| Phase windows | in the app |
Every fact in the app links to the public record behind it, with how many records agree and whether it is confirmed, reported or an estimate. What the terms mean.
What happened
Each change dated by the scene or the document, newest first.
- Moved from pre construction to under construction.
- Moved from queued to pre construction.
- A filing dates the construction start to May 2026.
- Stormwater permit filed.
- Satellite imagery shows first ground work on site.
- Clearing seen on site from satellite.
- Grading seen on site from satellite.
- Moved from pre construction to queued.
- Entered the public record for the first time.
Who was named on it, and when, is in the app.
Also in Roosevelt County
| Project | Stage | Size |
|---|---|---|
| Unnamed 150 MW solar projectUtility solar | Financed | 150 MW |
| Unnamed 50 MW solar projectUtility solar | Financed | 50 MW |
| Unnamed 500 MW solar projectUtility solar | Queued | 500 MW |
| Unnamed 500 MW solar projectUtility solar | Queued | 500 MW |
| Unnamed 400 MW wind projectOnshore wind | Queued | 400 MW |
| Unnamed 300 MW solar projectUtility solar | Queued | 300 MW |
More
In your AI assistant
Ask it in Claude, ChatGPT or Cursor.
Connect Groundtrace once, and your assistant answers from the same public records: the builder, the construction dates and the source behind each fact.
Who is building Blackwater Solar Center - NM in Roosevelt County, New Mexico, and when does construction start?Questions
Blackwater Solar Center - NM, in short.
Where is Blackwater Solar Center - NM?
Blackwater Solar Center - NM is a 199 MW utility solar project in Roosevelt County, New Mexico. The public page places it to within about ten kilometres; the precise location is in the subscriber record.
When does construction start on Blackwater Solar Center - NM?
A permit on file dates the start of work to the second quarter of 2026.
Who is developing Blackwater Solar Center - NM?
No public record read so far names its developer.
Who is building Blackwater Solar Center - NM?
A builder is named for Blackwater Solar Center - NM in the public record. Its name, the trade subcontractors and the people to call are in the subscriber record, each with the record that names it.