All industries › Utility solar › Wisconsin › Bright Future
Utility solar · St Croix County, Wisconsin
Bright Future
A 2 MW utility solar project in St Croix County, Wisconsin. Bright Future is built and in service. Public records name OneEnergy, Inc. as its developer. No public record read so far names its builder.
The record
What the public record says about Bright Future, as of 23 Oct 2026.
| Stage | Operating |
|---|---|
| Construction start | In service since 2025 |
| Size | 2 MW |
| Location | St Croix County, Wisconsin (to about 10 km) |
| Developer | OneEnergy, Inc. |
| Grid operator | — |
| Builder (EPC) | Not named yet |
| Trade subcontractors | in the app |
| People to call | in the app |
| Phase windows | in the app |
Every fact in the app links to the public record behind it, with how many records agree and whether it is confirmed, reported or an estimate. What the terms mean.
What happened
Each change dated by the scene or the document, newest first.
No change on record since Groundtrace started tracking it.
Who was named on it, and when, is in the app.
Also developed by OneEnergy, Inc.
| Project | Stage | Size |
|---|---|---|
| BjornUtility solar · Barron County, Wisconsin | Under construction | 5 MW |
| Bancroft (MN)Utility solar · Freeborn County, Minnesota | Operating | 3 MW |
| Grand Meadow (PV)Utility solar · Mower County, Minnesota | Operating | 3 MW |
| Bridge CreekUtility solar · Eau Claire County, Wisconsin | Operating | 2 MW |
| Douglas (IA)Utility solar · Mitchell County, Iowa | Operating | 2 MW |
| Elk Mound (PV)Utility solar · Chippewa County, Wisconsin | Operating | 2 MW |
Also in St Croix County
| Project | Stage | Size |
|---|---|---|
| Unnamed 101 MW solar projectUtility solar | Under construction | 101 MW |
| Unnamed 100 MW solar projectUtility solar | Financed | 100 MW |
| Unnamed 100 MW solar projectUtility solar | Financed | 100 MW |
| Northern Prairie 1Utility solar | Permitted | 101 MW |
| Next GenerationUtility solar | Operating | 2 MW |
| Warren DPC SolarUtility solar | Operating | 2 MW |
More
Questions
Bright Future, in short.
Where is Bright Future?
Bright Future is a 2 MW utility solar project in St Croix County, Wisconsin. The public page places it to within about ten kilometres; the precise location is in the subscriber record.
When does construction start on Bright Future?
Bright Future is built and in service since 2025.
Who is developing Bright Future?
OneEnergy, Inc., as the public record names it.
Who is building Bright Future?
No public record read so far names a builder for Bright Future. Groundtrace leaves the field empty rather than guess, and fills it when a permit, a filing or the builder's own page names one.
Pricing
Free to explore. Subscribe for the full record.
Usage-based, no seats, cancel any time. Pay for what your team and your assistant actually use.
Explore
Free
- The map, by state and industry
- The next projects to break ground, per state
- A page per project, developer and grid operator
- The glossary and guides
Team
From $750 per month2,000 records included, then $0.25 per record. Month to month.
- Every project in development, with timelines
- Builders, developers and trade subcontractors
- Work contacts
- App, API and MCP server
Enterprise
Custom
- Everything in Team
- Watchlists and alerts
- New states and industries on request
- Dedicated support
Request access
Tell us what you sell. We answer within a working day.
Write to hello@groundtrace.io with your name, your company and what you sell, and we set up your access.