All industries › Utility solar › New Mexico › Britton Solar Energy Center
Utility solar · Torrance County, New Mexico
Britton Solar Energy Center
A 50 MW utility solar project in Torrance County, New Mexico. Britton Solar Energy Center is built and in service. A builder is on record; its name and the people to call are in the app.
The record
What the public record says about Britton Solar Energy Center, as of 20 Nov 2026.
| Stage | Operating |
|---|---|
| Construction start | In service since 2019 |
| Size | 50 MW |
| Location | Torrance County, New Mexico (to about 10 km) |
| Developer | Not named in any record read |
| Grid operator | — |
| Builder (EPC) | on record, in the app |
| Trade subcontractors | in the app |
| People to call | in the app |
| Phase windows | in the app |
Every fact in the app links to the public record behind it, with how many records agree and whether it is confirmed, reported or an estimate. What the terms mean.
What happened
Each change dated by the scene or the document, newest first.
- Moved from queued to operating.
- A filing dates the construction start to February 2019.
- Stormwater permit filed.
- Stormwater permit filed.
- Moved from operating to queued.
- Entered the public record for the first time.
Who was named on it, and when, is in the app.
Also in Torrance County
| Project | Stage | Size |
|---|---|---|
| PNM request IA-PNM-2019-12Onshore wind | Queued | 80 MW |
| SunZia Wind NorthOnshore wind | Operating | 1,089 MW |
| Clines Corners Wind FarmOnshore wind | Operating | 325 MW |
| La Joya NMOnshore wind | Operating | 306 MW |
| El Cabo WindOnshore wind | Operating | 298 MW |
| High Lonesome MesaOnshore wind | Operating | 100 MW |
More
In your AI assistant
Ask it in Claude, ChatGPT or Cursor.
Connect Groundtrace once, and your assistant answers from the same public records: the builder, the construction dates and the source behind each fact.
Who is building Britton Solar Energy Center in Torrance County, New Mexico, and when does construction start?Questions
Britton Solar Energy Center, in short.
Where is Britton Solar Energy Center?
Britton Solar Energy Center is a 50 MW utility solar project in Torrance County, New Mexico. The public page places it to within about ten kilometres; the precise location is in the subscriber record.
When does construction start on Britton Solar Energy Center?
Britton Solar Energy Center is built and in service since 2019.
Who is developing Britton Solar Energy Center?
No public record read so far names its developer.
Who is building Britton Solar Energy Center?
A builder is named for Britton Solar Energy Center in the public record. Its name, the trade subcontractors and the people to call are in the subscriber record, each with the record that names it.
Start free
Open every project free: 500 credits a month, no card.
Every project and source, the builders and trade subcontractors on record and their construction dates, in the web app, the API or your AI assistant. Work contacts come with a paid plan.