A 1 MW onshore wind project in Suffolk County, Massachusetts. Deer Island Treatment Plant is built and in service. Public records name Massachusetts Wtr Rauth-Deer I as its developer. No public record read so far names its builder.
The record
What the public record says about Deer Island Treatment Plant, as of 20 Nov 2026.
| Stage | Operating |
|---|---|
| Construction start | In service since 2009 |
| Size | 1 MW |
| Location | Suffolk County, Massachusetts (to about 10 km) |
| Developer | Massachusetts Wtr Rauth-Deer I |
| Grid operator | — |
| Builder (EPC) | Not named yet |
| Trade subcontractors | in the app |
| People to call | in the app |
| Phase windows | in the app |
Every fact in the app links to the public record behind it, with how many records agree and whether it is confirmed, reported or an estimate. What the terms mean.
What happened
Each change dated by the scene or the document, newest first.
No change on record since Groundtrace started tracking it.
Who was named on it, and when, is in the app.
Also developed by Massachusetts Wtr Rauth-Deer I
| Project | Stage | Size |
|---|---|---|
| Deer Island Treatment PlantUtility solar · Suffolk County, Massachusetts | Operating | 0 MW |
Also in Suffolk County
| Project | Stage | Size |
|---|---|---|
| Energizar BESSBattery storage | Pre-construction | 250 MW |
| Lite Brite Battery StorageBattery storage | Financed | 306 MW |
| Hecate Energy Eastern Ave Energy CenterBattery storage | Financed | 250 MW |
| Meadow SolarUtility solar | Operating | 3 MW |
| Charlestown Wind TurbineOnshore wind | Operating | 2 MW |
| Boston Medical Center CHP PlantBattery storage | Operating | 1 MW |
More
In your AI assistant
Ask it in Claude, ChatGPT or Cursor.
Connect Groundtrace once, and your assistant answers from the same public records: the builder, the construction dates and the source behind each fact.
Who is building Deer Island Treatment Plant in Suffolk County, Massachusetts, and when does construction start?Questions
Deer Island Treatment Plant, in short.
Where is Deer Island Treatment Plant?
Deer Island Treatment Plant is a 1 MW onshore wind project in Suffolk County, Massachusetts. The public page places it to within about ten kilometres; the precise location is in the subscriber record.
When does construction start on Deer Island Treatment Plant?
Deer Island Treatment Plant is built and in service since 2009.
Who is developing Deer Island Treatment Plant?
Massachusetts Wtr Rauth-Deer I, as the public record names it.
Who is building Deer Island Treatment Plant?
No public record read so far names a builder for Deer Island Treatment Plant. Groundtrace leaves the field empty and fills it when a permit, a filing or the builder's own page names one.