All industries › Utility solar › Nevada › Dry Lake Solar Energy Center
Utility solar · Clark County, Nevada
Dry Lake Solar Energy Center
A 150 MW utility solar project in Clark County, Nevada. Dry Lake Solar Energy Center is built and in service. Public records name Nevada Power Co as its developer. No public record read so far names its builder.
The record
What the public record says about Dry Lake Solar Energy Center, as of 23 Oct 2026.
| Stage | Operating |
|---|---|
| Construction start | In service since 2024 |
| Size | 150 MW |
| Location | Clark County, Nevada (to about 10 km) |
| Developer | Nevada Power Co |
| Grid operator | — |
| Builder (EPC) | Not named yet |
| Trade subcontractors | in the app |
| People to call | in the app |
| Phase windows | in the app |
Every fact in the app links to the public record behind it, with how many records agree and whether it is confirmed, reported or an estimate. What the terms mean.
What happened
Each change dated by the scene or the document, newest first.
No change on record since Groundtrace started tracking it.
Who was named on it, and when, is in the app.
Also developed by Nevada Power Co
| Project | Stage | Size |
|---|---|---|
| Reid GardnerBattery storage · Clark County, Nevada | Operating | 220 MW |
| Nellis Solar PV IIUtility solar · Clark County, Nevada | Operating | 15 MW |
| Chukar Battery Energy Storage SystemBattery storage · Storey County, Nevada | Operating | 10 MW |
Also in Clark County
| Project | Stage | Size |
|---|---|---|
| Dry Lake East Energy CenterUtility solar | Under construction | 200 MW |
| ROCCASECCA BESSBattery storage | Under construction | 127 MW |
| Boulder Flats SolarUtility solar | Under construction | 113 MW |
| Southern Bighorn Solar HybridUtility solar | Pre-construction | 300 MW |
| Southern Bighorn Solar 2Utility solar | Pre-construction | 100 MW |
| NV Energy request Company 201Utility solar | Financed | 600 MW |
More
Questions
Dry Lake Solar Energy Center, in short.
Where is Dry Lake Solar Energy Center?
Dry Lake Solar Energy Center is a 150 MW utility solar project in Clark County, Nevada. The public page places it to within about ten kilometres; the precise location is in the subscriber record.
When does construction start on Dry Lake Solar Energy Center?
Dry Lake Solar Energy Center is built and in service since 2024.
Who is developing Dry Lake Solar Energy Center?
Nevada Power Co, as the public record names it.
Who is building Dry Lake Solar Energy Center?
No public record read so far names a builder for Dry Lake Solar Energy Center. Groundtrace leaves the field empty rather than guess, and fills it when a permit, a filing or the builder's own page names one.
Pricing
Free to explore. Subscribe for the full record.
Usage-based, no seats, cancel any time. Pay for what your team and your assistant actually use.
Explore
Free
- The map, by state and industry
- The next projects to break ground, per state
- A page per project, developer and grid operator
- The glossary and guides
Team
From $750 per month2,000 records included, then $0.25 per record. Month to month.
- Every project in development, with timelines
- Builders, developers and trade subcontractors
- Work contacts
- App, API and MCP server
Enterprise
Custom
- Everything in Team
- Watchlists and alerts
- New states and industries on request
- Dedicated support
Request access
Tell us what you sell. We answer within a working day.
Write to hello@groundtrace.io with your name, your company and what you sell, and we set up your access.