Fort Gordon Solar

A 29 MW utility solar project in Richmond County, Georgia. Fort Gordon Solar is built and in service. Public records name Georgia Power Co as its developer. No public record read so far names its builder.

The record

What the public record says about Fort Gordon Solar, as of 23 Oct 2026.

StageOperating
Construction startIn service since 2016
Size29 MW
LocationRichmond County, Georgia (to about 10 km)
DeveloperGeorgia Power Co
Grid operator—
Builder (EPC)Not named yet
Trade subcontractors in the app
People to call in the app
Phase windows in the app

Every fact in the app links to the public record behind it, with how many records agree and whether it is confirmed, reported or an estimate. What the terms mean.

What happened

Each change dated by the scene or the document, newest first.

  1. Stormwater permit filed.
  2. Entered the public record for the first time.

Who was named on it, and when, is in the app.

Also developed by Georgia Power Co

ProjectStageSize
HammondBattery storage · Floyd County, GeorgiaUnder construction58 MW
McGrau Ford Battery Storage FacilityBattery storage · Cherokee County, GeorgiaOperating530 MW
Robins Air Force Base SolarUtility solar · Bibb County, GeorgiaOperating128 MW
Mossy Branch Battery FacilityBattery storage · Talbot County, GeorgiaOperating65 MW
Moody Air Force Base SolarUtility solar · Lowndes County, GeorgiaOperating50 MW
Marine Corps Logistics Base SolarUtility solar · Dougherty County, GeorgiaOperating31 MW

Every Georgia Power Co project

Also in Richmond County

ProjectStageSize
ATL3 Mass GradingData centersUnder construction—
Richmond County GA S2Utility solarOperating3 MW
ApalachicolaUtility solarOperating2 MW
Richmond Hayes SolarUtility solarOperating2 MW

More

Questions

Fort Gordon Solar, in short.

Where is Fort Gordon Solar?

Fort Gordon Solar is a 29 MW utility solar project in Richmond County, Georgia. The public page places it to within about ten kilometres; the precise location is in the subscriber record.

When does construction start on Fort Gordon Solar?

Fort Gordon Solar is built and in service since 2016.

Who is developing Fort Gordon Solar?

Georgia Power Co, as the public record names it.

Who is building Fort Gordon Solar?

No public record read so far names a builder for Fort Gordon Solar. Groundtrace leaves the field empty rather than guess, and fills it when a permit, a filing or the builder's own page names one.

Pricing

Free to explore. Subscribe for the full record.

Usage-based, no seats, cancel any time. Pay for what your team and your assistant actually use.

Explore

Free

  • The map, by state and industry
  • The next projects to break ground, per state
  • A page per project, developer and grid operator
  • The glossary and guides
Browse coverage

Team

From $750 per month2,000 records included, then $0.25 per record. Month to month.

  • Every project in development, with timelines
  • Builders, developers and trade subcontractors
  • Work contacts
  • App, API and MCP server
Request access

Enterprise

Custom

  • Everything in Team
  • Watchlists and alerts
  • New states and industries on request
  • Dedicated support
Request access

Request access

Tell us what you sell. We answer within a working day.

Write to hello@groundtrace.io with your name, your company and what you sell, and we set up your access.