A 65 MW onshore wind project in Navajo County, Arizona. Poseidon Wind is built and in service. Public records name Axium Arizona Renewables, LLC as its developer. No public record read so far names its builder.
The record
What the public record says about Poseidon Wind, as of 20 Nov 2026.
| Stage | Operating |
|---|---|
| Construction start | In service since 2010 |
| Size | 65 MW |
| Location | Navajo County, Arizona (to about 10 km) |
| Developer | Axium Arizona Renewables, LLC |
| Grid operator | — |
| Builder (EPC) | Not named yet |
| Trade subcontractors | in the app |
| People to call | in the app |
| Phase windows | in the app |
Every fact in the app links to the public record behind it, with how many records agree and whether it is confirmed, reported or an estimate. What the terms mean.
What happened
Each change dated by the scene or the document, newest first.
No change on record since Groundtrace started tracking it.
Who was named on it, and when, is in the app.
Also developed by Axium Arizona Renewables, LLC
| Project | Stage | Size |
|---|---|---|
| Poseidon SolarUtility solar · Gila County, Arizona | Operating | 20 MW |
Also in Navajo County
| Project | Stage | Size |
|---|---|---|
| Snowflake A Solar and BESSUtility solar | Under construction | 475 MW |
| Hashknife Energy CenterUtility solar | Under construction | 275 MW |
| APS request Q230Utility solar | Under construction | 200 MW |
| APS request Q270Utility solar | Under construction | 200 MW |
| Hashknife Energy Center IIUtility solar | Under construction | 200 MW |
| APS request Q271Battery storage | Under construction | 75 MW |
More
In your AI assistant
Ask it in Claude, ChatGPT or Cursor.
Connect Groundtrace once, and your assistant answers from the same public records: the builder, the construction dates and the source behind each fact.
Who is building Poseidon Wind in Navajo County, Arizona, and when does construction start?Questions
Poseidon Wind, in short.
Where is Poseidon Wind?
Poseidon Wind is a 65 MW onshore wind project in Navajo County, Arizona. The public page places it to within about ten kilometres; the precise location is in the subscriber record.
When does construction start on Poseidon Wind?
Poseidon Wind is built and in service since 2010.
Who is developing Poseidon Wind?
Axium Arizona Renewables, LLC, as the public record names it.
Who is building Poseidon Wind?
No public record read so far names a builder for Poseidon Wind. Groundtrace leaves the field empty and fills it when a permit, a filing or the builder's own page names one.
Start free
Open every project free: 500 credits a month, no card.
Every project and source, the builders and trade subcontractors on record and their construction dates, in the web app, the API or your AI assistant. Work contacts come with a paid plan.