All industries › Onshore wind › Washington › Tucannon River Wind Farm
Onshore wind · Columbia County, Washington
Tucannon River Wind Farm
A 267 MW onshore wind project in Columbia County, Washington. Tucannon River Wind Farm is built and in service. Public records name Portland General Electric Co as its developer. No public record read so far names its builder.
The record
What the public record says about Tucannon River Wind Farm, as of 20 Nov 2026.
| Stage | Operating |
|---|---|
| Construction start | In service since 2014 |
| Size | 267 MW |
| Location | Columbia County, Washington (to about 10 km) |
| Developer | Portland General Electric Co |
| Grid operator | — |
| Builder (EPC) | Not named yet |
| Trade subcontractors | in the app |
| People to call | in the app |
| Phase windows | in the app |
Every fact in the app links to the public record behind it, with how many records agree and whether it is confirmed, reported or an estimate. What the terms mean.
What happened
Each change dated by the scene or the document, newest first.
No change on record since Groundtrace started tracking it.
Who was named on it, and when, is in the app.
Also developed by Portland General Electric Co
| Project | Stage | Size |
|---|---|---|
| Biglow Canyon Wind FarmOnshore wind · Sherman County, Oregon | Operating | 450 MW |
| Clearwater Wind EastOnshore wind · Custer County, Montana | Operating | 208 MW |
| Seaside BESSBattery storage · Multnomah County, Oregon | Operating | 200 MW |
| Wheatridge 1Onshore wind · Morrow County, Oregon | Operating | 100 MW |
| Constable BESSBattery storage · Washington County, Oregon | Operating | 75 MW |
| Coffee Creek BESSBattery storage · Washington County, Oregon | Operating | 17 MW |
Also in Columbia County
| Project | Stage | Size |
|---|---|---|
| BPA request G0847Utility solar | Financed | 150 MW |
| BPA request G1086Utility solar | Queued | 177 MW |
| Marengo Wind PlantOnshore wind | Operating | 234 MW |
| Hopkins Ridge WindOnshore wind | Operating | 157 MW |
More
In your AI assistant
Ask it in Claude, ChatGPT or Cursor.
Connect Groundtrace once, and your assistant answers from the same public records: the builder, the construction dates and the source behind each fact.
Who is building Tucannon River Wind Farm in Columbia County, Washington, and when does construction start?Questions
Tucannon River Wind Farm, in short.
Where is Tucannon River Wind Farm?
Tucannon River Wind Farm is a 267 MW onshore wind project in Columbia County, Washington. The public page places it to within about ten kilometres; the precise location is in the subscriber record.
When does construction start on Tucannon River Wind Farm?
Tucannon River Wind Farm is built and in service since 2014.
Who is developing Tucannon River Wind Farm?
Portland General Electric Co, as the public record names it.
Who is building Tucannon River Wind Farm?
No public record read so far names a builder for Tucannon River Wind Farm. Groundtrace leaves the field empty and fills it when a permit, a filing or the builder's own page names one.
Start free
Open every project free: 500 credits a month, no card.
Every project and source, the builders and trade subcontractors on record and their construction dates, in the web app, the API or your AI assistant. Work contacts come with a paid plan.