All industries › Onshore wind › Wind Colebrook South
Onshore wind · Litchfield County, Connecticut
Wind Colebrook South
A 5 MW onshore wind project in Litchfield County, Connecticut. Wind Colebrook South is built and in service. Public records name Wind Colebrook South as its developer. No public record read so far names its builder.
The record
What the public record says about Wind Colebrook South, as of 20 Nov 2026.
| Stage | Operating |
|---|---|
| Construction start | In service since 2015 |
| Size | 5 MW |
| Location | Litchfield County, Connecticut (to about 10 km) |
| Developer | Wind Colebrook South |
| Grid operator | — |
| Builder (EPC) | Not named yet |
| Trade subcontractors | in the app |
| People to call | in the app |
| Phase windows | in the app |
Every fact in the app links to the public record behind it, with how many records agree and whether it is confirmed, reported or an estimate. What the terms mean.
What happened
Each change dated by the scene or the document, newest first.
No change on record since Groundtrace started tracking it.
Who was named on it, and when, is in the app.
Also in Litchfield County
| Project | Stage | Size |
|---|---|---|
| Unnamed 142 MW storage projectBattery storage | Financed | 142 MW |
| SR LitchfieldUtility solar | Operating | 20 MW |
| Norfolk Landfill Solar ProjectUtility solar | Operating | 4 MW |
| Becton Dickinson Ground & Roof TopUtility solar | Operating | 2 MW |
| BunceUtility solar | Operating | 2 MW |
| Platt HillUtility solar | Operating | 2 MW |
More
In your AI assistant
Ask it in Claude, ChatGPT or Cursor.
Connect Groundtrace once, and your assistant answers from the same public records: the builder, the construction dates and the source behind each fact.
Who is building Wind Colebrook South in Litchfield County, Connecticut, and when does construction start?Questions
Wind Colebrook South, in short.
Where is Wind Colebrook South?
Wind Colebrook South is a 5 MW onshore wind project in Litchfield County, Connecticut. The public page places it to within about ten kilometres; the precise location is in the subscriber record.
When does construction start on Wind Colebrook South?
Wind Colebrook South is built and in service since 2015.
Who is developing Wind Colebrook South?
Wind Colebrook South, as the public record names it.
Who is building Wind Colebrook South?
No public record read so far names a builder for Wind Colebrook South. Groundtrace leaves the field empty and fills it when a permit, a filing or the builder's own page names one.
Start free
Open every project free: 500 credits a month, no card.
Every project and source, the builders and trade subcontractors on record and their construction dates, in the web app, the API or your AI assistant. Work contacts come with a paid plan.