All industries › Utility solar › Texas › Brightside Solar Alt POI
Utility solar · Live Oak County, Texas
Brightside Solar Alt POI
A 50 MW utility solar project in Live Oak County, Texas. Brightside Solar Alt POI has money committed on record: a signed interconnection agreement, a financing close or a tax-credit filing. Public records name Brightside Solar, LLC as its developer. No public record read so far names its builder.
The record
What the public record says about Brightside Solar Alt POI, as of 23 Oct 2026.
| Stage | Financed |
|---|---|
| Construction start | Not dated or estimated yet |
| Size | 50 MW |
| Location | Live Oak County, Texas (to about 10 km) |
| Developer | Brightside Solar, LLC |
| Grid operator | ERCOT |
| Builder (EPC) | Not named yet |
| Trade subcontractors | in the app |
| People to call | in the app |
| Phase windows | in the app |
Every fact in the app links to the public record behind it, with how many records agree and whether it is confirmed, reported or an estimate. What the terms mean.
What happened
Each change dated by the scene or the document, newest first.
No change on record since Groundtrace started tracking it.
Who was named on it, and when, is in the app.
Also developed by Brightside Solar, LLC
| Project | Stage | Size |
|---|---|---|
| Brightside SolarUtility solar · Bee County, Texas | Operating | 50 MW |
Also in Live Oak County
| Project | Stage | Size |
|---|---|---|
| Bird Dog Energy StorageBattery storage | Under construction | 60 MW |
| Anagram SolarUtility solar | Queued | 131 MW |
| Buck Ranch Solar SLFUtility solar | Queued | 41 MW |
| Buck Ranch Storage SLFBattery storage | Queued | 41 MW |
More
Questions
Brightside Solar Alt POI, in short.
Where is Brightside Solar Alt POI?
Brightside Solar Alt POI is a 50 MW utility solar project in Live Oak County, Texas, in ERCOT's interconnection queue. The public page places it to within about ten kilometres; the precise location is in the subscriber record.
When does construction start on Brightside Solar Alt POI?
No record dates the construction start yet, and Groundtrace has not estimated one.
Who is developing Brightside Solar Alt POI?
Brightside Solar, LLC, as the public record names it.
Who is building Brightside Solar Alt POI?
No public record read so far names a builder for Brightside Solar Alt POI. Groundtrace leaves the field empty rather than guess, and fills it when a permit, a filing or the builder's own page names one.
Pricing
Free to explore. Subscribe for the full record.
Usage-based, no seats, cancel any time. Pay for what your team and your assistant actually use.
Explore
Free
- The map, by state and industry
- The next projects to break ground, per state
- A page per project, developer and grid operator
- The glossary and guides
Team
From $750 per month2,000 records included, then $0.25 per record. Month to month.
- Every project in development, with timelines
- Builders, developers and trade subcontractors
- Work contacts
- App, API and MCP server
Enterprise
Custom
- Everything in Team
- Watchlists and alerts
- New states and industries on request
- Dedicated support
Request access
Tell us what you sell. We answer within a working day.
Write to hello@groundtrace.io with your name, your company and what you sell, and we set up your access.