Dry Lake Wind
A 63 MW onshore wind project in Navajo County, Arizona. Dry Lake Wind is built and in service. Public records name Avangrid Power LLC as its developer. No public record read so far names its builder.
The record
What the public record says about Dry Lake Wind, as of 20 Nov 2026.
| Stage | Operating |
|---|---|
| Construction start | In service since 2009 |
| Size | 63 MW |
| Location | Navajo County, Arizona (to about 10 km) |
| Developer | Avangrid Power LLC |
| Grid operator | — |
| Builder (EPC) | Not named yet |
| Trade subcontractors | in the app |
| People to call | in the app |
| Phase windows | in the app |
Every fact in the app links to the public record behind it, with how many records agree and whether it is confirmed, reported or an estimate. What the terms mean.
What happened
Each change dated by the scene or the document, newest first.
No change on record since Groundtrace started tracking it.
Who was named on it, and when, is in the app.
Also developed by Avangrid Power LLC
| Project | Stage | Size |
|---|---|---|
| Osagrove Flats WindOnshore wind · Lasalle County, Illinois | Under construction | 150 MW |
| Bluebird SolarUtility solar · Klickitat County, Washington | Under construction | 140 MW |
| Great Bear SolarUtility solar · Van Wert County, Ohio | Pre-construction | 46 MW |
| Allen Acres SolarUtility solar · LaSalle County, Illinois | Queued | 150 MW |
| Bright Mountain SolarUtility solar · Perry County, Kentucky | Queued | 80 MW |
| Blue Creek WFOnshore wind · Van Wert County, Ohio | Operating | 350 MW |
Also in Navajo County
| Project | Stage | Size |
|---|---|---|
| Snowflake A Solar and BESSUtility solar | Under construction | 475 MW |
| Hashknife Energy CenterUtility solar | Under construction | 275 MW |
| APS request Q230Utility solar | Under construction | 200 MW |
| APS request Q270Utility solar | Under construction | 200 MW |
| Hashknife Energy Center IIUtility solar | Under construction | 200 MW |
| APS request Q271Battery storage | Under construction | 75 MW |
More
In your AI assistant
Ask it in Claude, ChatGPT or Cursor.
Connect Groundtrace once, and your assistant answers from the same public records: the builder, the construction dates and the source behind each fact.
Who is building Dry Lake Wind in Navajo County, Arizona, and when does construction start?Questions
Dry Lake Wind, in short.
Where is Dry Lake Wind?
Dry Lake Wind is a 63 MW onshore wind project in Navajo County, Arizona. The public page places it to within about ten kilometres; the precise location is in the subscriber record.
When does construction start on Dry Lake Wind?
Dry Lake Wind is built and in service since 2009.
Who is developing Dry Lake Wind?
Avangrid Power LLC, as the public record names it.
Who is building Dry Lake Wind?
No public record read so far names a builder for Dry Lake Wind. Groundtrace leaves the field empty and fills it when a permit, a filing or the builder's own page names one.