All industries › Onshore wind › Illinois › Green River Wind Farm Phase 2
Onshore wind · Lee County, Illinois
Green River Wind Farm Phase 2
A 225 MW onshore wind project in Lee County, Illinois. Green River Wind Farm Phase 2 is built and in service. Public records name Geronimo Power as its developer. No public record read so far names its builder.
The record
What the public record says about Green River Wind Farm Phase 2, as of 20 Nov 2026.
| Stage | Operating |
|---|---|
| Construction start | In service since 2019 |
| Size | 225 MW |
| Location | Lee County, Illinois (to about 10 km) |
| Developer | Geronimo Power |
| Grid operator | PJM |
| Builder (EPC) | Not named yet |
| Trade subcontractors | in the app |
| People to call | in the app |
| Phase windows | in the app |
Every fact in the app links to the public record behind it, with how many records agree and whether it is confirmed, reported or an estimate. What the terms mean.
What happened
Each change dated by the scene or the document, newest first.
No change on record since Groundtrace started tracking it.
Who was named on it, and when, is in the app.
Also developed by Geronimo Power
| Project | Stage | Size |
|---|---|---|
| Bee Hollow SolarUtility solar · St Clair County, Illinois | Under construction | 150 MW |
| Plum CreekOnshore wind · Cottonwood County, Minnesota | Pre-construction | 200 MW |
| Grant SolarUtility solar · McCook County, South Dakota | Pre-construction | 50 MW |
| Yellowbud SolarUtility solar · Ross County, Ohio | Operating | 274 MW |
| Crocker Wind FarmOnshore wind · Clark County, South Dakota | Operating | 200 MW |
| Unbridled SolarUtility solar · Henderson County, Kentucky | Operating | 160 MW |
Also in Lee County
| Project | Stage | Size |
|---|---|---|
| Shady Oaks Wind Power ProjectOnshore wind | Under construction | 215 MW |
| Unnamed 1,200 MW solar projectUtility solar | Queued | 1,200 MW |
| Unnamed 1,200 MW storage projectBattery storage | Queued | 1,200 MW |
| Unnamed 1,200 MW storage projectBattery storage | Queued | 1,200 MW |
| Unnamed 1,200 MW storage projectBattery storage | Queued | 1,200 MW |
| Steward Creek Solar Phase 1Utility solar | Queued | 1,200 MW |
More
In your AI assistant
Ask it in Claude, ChatGPT or Cursor.
Connect Groundtrace once, and your assistant answers from the same public records: the builder, the construction dates and the source behind each fact.
Who is building Green River Wind Farm Phase 2 in Lee County, Illinois, and when does construction start?Questions
Green River Wind Farm Phase 2, in short.
Where is Green River Wind Farm Phase 2?
Green River Wind Farm Phase 2 is a 225 MW onshore wind project in Lee County, Illinois, in PJM's interconnection queue. The public page places it to within about ten kilometres; the precise location is in the subscriber record.
When does construction start on Green River Wind Farm Phase 2?
Green River Wind Farm Phase 2 is built and in service since 2019.
Who is developing Green River Wind Farm Phase 2?
Geronimo Power, as the public record names it.
Who is building Green River Wind Farm Phase 2?
No public record read so far names a builder for Green River Wind Farm Phase 2. Groundtrace leaves the field empty and fills it when a permit, a filing or the builder's own page names one.
Start free
Open every project free: 500 credits a month, no card.
Every project and source, the builders and trade subcontractors on record and their construction dates, in the web app, the API or your AI assistant. Work contacts come with a paid plan.